See it before you download it
The example is invented to show how a few lines in date order reveal a repeat failure.
What is an equipment maintenance log?
An equipment maintenance log is the running history of one machine: every PM, repair and inspection, in date order, with the parts and time each one took.
A work order records one job. The log puts every job on one machine side by side, so patterns show: the bearing that fails every six weeks, the PM that keeps finding nothing, the machine that costs more to keep than to replace.
It is also your proof. Audits, warranty claims, insurers and buyers of used equipment all ask for the same thing: what was done, and when. More in our maintenance logbook and asset maintenance history entries.
What goes on a maintenance log.And why each column earns its place.
Keep each line short. The full detail lives on the work order. The log is the index.
| Field | Why it matters | Needed? |
|---|---|---|
| Machine name and tag | One log per machine. A site wide log becomes a list nobody reads. | Essential |
| Date | In order, so the gaps and the repeats are obvious. | Essential |
| Work done | One line per job, in plain words. | Essential |
| Parts | Shows which spares this machine eats. | Essential |
| Hours | Adds up to the true cost of keeping it running. | Essential |
| Make, model and serial | What you need to order parts or call the maker. | Recommended |
| Work order no. | Links each line back to the full record. | Recommended |
| Type | PM or repair. The balance tells you if PMs are working. | Recommended |
| Done by | Who knows this machine best. | Optional |
| Pattern noticed | Where the log pays for itself. | Optional |
Five questions a log answers
More repairs between PMs, closer together, is the early warning.
Hours and parts over a year. The numbers behind repair or replace.
Keep those on the shelf and stop paying for rush orders.
The answer auditors, insurers and warranty claims ask for.
The names on the log are who to call. See asset criticality for which logs matter most.
Six habits that makethe history worth having.
- 1Every
Log every job, even the five minute ones.
Small jobs are where repeat failures start to show.
- 2Order
Keep it in date order.
Write new lines at the bottom. Never fill gaps from memory later.
- 3Link
Write the work order number.
The log stays short and the detail is one step away.
- 4Parts
Name parts with their number.
“6205-2RS” twice in a quarter is a pattern. “Bearing” isn’t.
- 5Read
Read it at every PM.
Two minutes on the last few lines tells the tech what to look for.
- 6Act
Act on the pattern.
A part replaced twice in a quarter is a PM or design problem, not bad luck. See root cause analysis.
A log is the start.Keeping it up to date is the hard part.
On paper, the log lives in a binder in the office while the work happens at the machine. Jobs get missed, lines get written weeks later, and the history is never where the tech is standing.
With Zoidii, every work order files itself against the machine. Scan the QR label and the whole history is on your phone, in order. Ask the machine what has been done and it tells you.
- Jobs
- 5 since 2 Sep
- Repairs
- 3
- Repeat
- Drive end bearing, twice
- Hours
- 5.25
Templates that go with it
Maintenance log questions
Is this equipment maintenance log free?
Yes. Download the Excel, Word or PDF version with no email and no signup. Use it, change it and share it with your crew.
Should I use the Excel or the Word version?
Use Excel to keep one tab per machine and sort or filter the history. Use Word to change the layout or add your logo. Use the PDF to print a sheet for each machine’s binder.
Can I use the log in Google Sheets or Google Docs?
Yes. Upload the Excel file to Google Drive and open it with Google Sheets, or open the Word file with Google Docs. The layout carries across.
What is the difference between a maintenance log and a work order?
A work order is the full record of one job. The log is one line per job on one machine, in date order, so you can see the history at a glance.
Do I need one log per machine?
Yes, one per machine or asset. A single log for the whole site turns into a list nobody can read. In Excel, use one tab per machine.
How long should I keep equipment maintenance records?
For the life of the machine at least. Many safety, food and insurance standards expect records to be kept for years, so check the ones that apply to you.
When should I move the maintenance log off paper?
When the log is never where the work happens, when lines get written weeks late, or when nobody reads it before a repair. Our guide to moving off paper covers how to start with your key machines.