The example is invented to show the level of detail that makes a work order useful later.
What is a work order?
A work order is the record of one maintenance job: which machine, what was wrong, what was done, which parts it used and how long it took.
It does two jobs. Before the work, it tells someone what to fix and how urgent it is. After the work, it becomes the machine's history. That second job is the one that pays off. It is how you spot the bearing that fails every six weeks, prove a PM was done to an auditor, and know which spares to keep on the shelf.
A request is different. A maintenance request is anyone on site saying something is wrong. A work order is maintenance accepting it and recording the fix. More in our work order glossary entry.
What goes on a work order.And why each field earns its place.
The template has room for more, but only five fields are essential. The rest make the record more useful when there is time.
| Field | Why it matters | Needed? |
|---|---|---|
| Machine name and tag | Without it, the job can't become the machine's history. | Essential |
| Problem | What someone saw, heard or measured. The starting point next time. | Essential |
| What was done | The fix, in plain words. Tells the next tech what has already been tried. | Essential |
| Parts used | Keeps stock right and shows which spares a machine eats. | Essential |
| Time | Labour hours and downtime. The numbers that justify crew and budget. | Essential |
| Work order number | One number per job, so it can be found and referred to. | Recommended |
| Priority and type | Separates emergencies from planned work, and corrective from preventive. | Recommended |
| Cause found | The root cause, not the symptom. The field that prevents the repeat. | Recommended |
| Machine status | Running, restricted or down. Tells production what to expect. | Recommended |
| Requested by, assigned to | Who reported it and who owns it. | Optional |
| Follow up needed | Turns one repair into a PM change or a parts order. | Optional |
| Signatures | Sign off for audits, safety work and contractors. | Optional |
Five types of work order
Something broke or is about to. Fix it and record why.
Planned work on a schedule: by date, run hours or cycles. See our PM guide.
A safety risk or a stopped line. Done now, written up straight after.
A check against a list. Any failed step should raise its own corrective work order.
Guarding, lockout tagout and compliance work. Usually needs a sign off. See lockout tagout.
Six habits that makethe record worth keeping.
- 1Cause
Write the cause, not just the symptom.
"Bearing dry, grease line kinked" stops the repeat. "Fixed noise" doesn't.
- 2Parts
Name parts with their number.
"6205-2RS" can be reordered. "Bearing" can't.
- 3Time
Record the time, even roughly.
Rough hours beat no hours. They add up to the case for more crew.
- 4Scope
One machine, one job, one work order.
Three fixes on one sheet can't be traced back to three machines.
- 5Timing
Close it the same shift.
Detail fades by the end of the day. Write it at the machine if you can.
- 6Next
Note the follow up.
A repair that should change a PM or a parts order only does if someone writes it down.
A good form is the start.Getting it filled in is the hard part.
Paper work orders get written at the end of a shift, from memory, or not at all. Then they sit in a binder where nobody at the machine can see them. Leaders estimate only 54% of scheduled PM gets done, and on paper the missed ones leave no trace.
With Zoidii, the tech scans the machine and says what they did. Zoidii fills in the same fields as this template, logs the parts and files it against the machine.
- Machine
- C-3 Infeed conveyor
- Problem
- Grinding at drive end
- Cause
- Dry bearing, kinked grease line
- Part
- 6205-2RS bearing × 1
- Time
- 1.25 h
Source: Limble State of Maintenance Report 2026.
Templates that go with it
Work order template questions
Is this work order template free?
Yes. Download the Excel, Word or PDF version with no email and no signup. Use it, change it and share it with your crew.
Should I use the Excel or the Word version?
Use Excel if you will fill work orders in on a computer or want to keep a running log in one file. Use Word if you want to change the layout or add your logo. Use the PDF to print a pad for the clipboard.
Can I use the template in Google Sheets or Google Docs?
Yes. Upload the Excel file to Google Drive and open it with Google Sheets, or open the Word file with Google Docs. The layout carries across.
What is the difference between a work order and a maintenance request?
A maintenance request is anyone on site reporting a problem. A work order is maintenance accepting the job, doing it and recording the fix. One request can lead to one or more work orders.
How should I number work orders?
Use one running number with a short prefix, such as WO-0142. Don't reuse numbers and don't restart each year unless you add the year, such as WO-26-0142. The number only has to be unique so the job can be found.
What are the essential fields on a work order?
Five: the machine, the problem, what was done, the parts used and the time taken. Priority, type, cause and sign offs make the record more useful but are optional for a small team.
When should I move from paper work orders to software?
When more than one person needs the history, when PMs get missed because they live on a wall calendar, or when parts run out because usage was never written down. Our guide to moving off paper covers how to start with your key machines.